Renovation strategy from the listing.

Paste the link. In minutes you get:

Renovation cost broken down by room.
Sold comparables and estimated margin.
A brief ready to send to your contractor.
Negotiation strategy backed by evidence.
Renovation
EN
After
Before
After
Before
BEFORE
AFTER
Living room

€103k

investment

+€105k

value added

Construction time

24-26 weeks

What slows down a deal (even if you're experienced)

Visits that don't pencil

Visits that don't pencil

You travel, do the viewing, and then renovation cost kills the margin.

Estimates that take days

Estimates that take days

Until a contractor sees it, there are no numbers. Meanwhile, the deal moves.

Negotiating blind

Negotiating blind

"It needs work" isn't leverage. Photos plus costs are.

It's not magic. It's market data.

Leo cross-checks photos, cadastral data, and comparables to produce defensible numbers.

Listing photo
Your listing
€250kcurrent price

3 hab. Eixample • 85m²

+€95k

investment

+€160k

value added

Sold comparable
Comparable
€410ksold price

Full renovation

Good materials and complete execution

Negotiate with data, not instinct

Target price, key issues, and how to frame it.

Target price

Leo proposes an offer price with concrete arguments: issues, photos, and estimated costs.

The viewing stops being the start of your analysis. It becomes the final confirmation.

Negotiate
EN

Target price

€312.000

Save €18K

Use concrete issues (with photo evidence) to justify the discount.

Evidence

Main issue

Bathroom moisture (waterproofing + re-tiling)

Estimated cost€12.400

How to frame it

“I love the location. But with this moisture, the real cost to make it rentable is high. Let’s adjust the price.”

One tap and your contractor has the scope

Copy-paste the brief. Fewer calls. More clarity.

Javi Renovations

online

Hey! Sharing the brief for a quote.

Scope:

• Kitchen — full renovation

• Bathroom — tiling + fixtures

• Floors + full repaint

Can we schedule a visit this week?

Leo.casa

app.leo.casa

Renovation analysis — Calle Nàpols

Cost, comparables & brief

12:41

Message

Professional methodology

Automated Audit

Each property is analyzed with the same standards used by technical architects.

AI light and space analysis
East facing
Morning sun
3,2m
High ceiling
~28m²
Living area
Light: Excellent
L

Leo Intelligence

Multimodal analysis combining images, cadastral data, and market comps for reliable budgets.

Material and condition detection
Cadastral surface areas
Nearby sold comparables
Up-to-date m² costs
CTE standards integrated
Energy certification

Standards included

CTE

DB-HE, DB-HS, DB-SI

Energy, health, fire

REBT

ITC-BT-25, ITC-BT-18

Circuits, panels, outlets

ITE

Technical inspection

Structure, condition

RITE

HVAC

Heating, cooling, hot water

Validated against Spanish architect associations guidelines

Official cost bases

Local market pricing

Each budget uses the official cost bases of your autonomous community.

Bathroom renovation

6m² · 10 weeks

Demolition
€ 680
Installations
€ 1,920
Finishes
€ 1,650
PEM
€ 4,250
+ GG + BI (19%)
€ 808
PEC
€ 5,058
+ IVA 10%
€ 506
Total€ 5,564

Official cost bases

BCCA

Andalusia Construction Cost Base

Junta de Andalucía • 2024

ITeC

BEDEC Catalonia

Institut de Tecnologia • 2024

BDC

Madrid Construction Database

Comunidad de Madrid • 2024

Each budget uses official local price bases.

Try it on your next deal

Watch the demo and tell me this doesn't change your workflow.